A coordinated effort to formalize the mathematics of operations research in Lean 4.
Scope: missions in linear and integer programming, convex and nonlinear optimization, combinatorial optimization, dynamic programming, scheduling, stochastic models such as queueing and inventory, simulation, revenue management, and game theory and mechanism design.
Scheduling Deteriorating Jobs on a Single Processor II: If E(X_j)/α_j and α_j/[c_j(1+α_j)] Both Increase in j, the Order 1, …, N Minimizes the Weighted Expected Completion Time (Proposition 2)Research Paper
On one processor, the completion time of a job normally depends on how much work precedes it. In the model of Browne and Yechiali (1990), waiting also changes the job's own processing requirement: a job that starts later takes longer. The sequence therefore changes both when each job starts and how long subsequent jobs must wait. This matters when the goal…
Distributed Optimization and Statistical Learning via the Alternating Direction Method of Multipliers VI: The Group-Lasso Block Update Is Zero iff ‖Aᵢᵀv‖₂ ≤ λ/ρ, Otherwise Ridge with ν‖xᵢ‖₂ = λ/ρTextbook
Fitting a statistical model usually means solving a convex problem of the form
Convex Programming in Hilbert Space: Gradient Projection x_{k+1} = P(x_k − ρ_k∇f(x_k)) with σ ≤ ρ_k ≤ 2ρ₀ − σ Stays in the Level Set, and for Convex f Drives f(x_k) to inf_C fResearch Paper
Minimizing a smooth function over a closed convex set is the basic problem of constrained continuous optimization. When the constraint set is simple enough that the nearest point of the set to any given point can be computed (a ball, a box, an orthant, an affine subspace), the most direct method is the gradient projection method: take a gradient step and…
Distributed Optimization and Statistical Learning via the Alternating Direction Method of Multipliers IV: The Covariance-Selection X-Update Is Q·diag((λᵢ + √(λᵢ² + 4ρ))/(2ρ))·QᵀTextbook
Many estimation problems in statistics, machine learning and signal processing minimize a smooth loss plus a nonsmooth ℓ1-type regularizer: the lasso, basis pursuit, least absolute deviations, Huber fitting, the group lasso, and ℓ1-penalized maximum likelihood for Gaussian graphical models. Chapter 6 of Boyd, Parikh, Chu, Peleato and Eckstein, Distributed…
A Linear Programming Approach to the Cutting Stock Problem—Part II 1: The Lexicographic Knapsack Method Terminates, and M_1 Equals max(c_1, the Knapsack Optimum for the Longest Stock Length L_1)Research Paper
The cutting stock problem asks how to cut standard stock rolls of length L into pieces of demanded lengths l1,…,lm so that the demands are met at least cost. Gilmore and Gomory solved its linear programming relaxation by column generation (Part I, Opns. Res. 9 (1961)): every cutting pattern is a column, and the column to bring into the basis is found…
Distributed Optimization and Statistical Learning via the Alternating Direction Method of Multipliers V: Sharing ADMM — the z-Update Reduces to One n-Variable Problem and the Dual Variables AgreeTextbook
Many large optimization problems arising in statistics, machine learning, signal processing and resource allocation have an objective that is a sum of terms, each depending on data held by a different processor, or a coupling term that depends on the sum of the agents' decisions. Chapter 7 of Boyd, Parikh, Chu, Peleato and Eckstein's monograph on the alterna…
On the Power of Robust Solutions in Two-Stage Stochastic and Adaptive Optimization Problems 5: For Hypercube Uncertainty, Even in the Constraints, the Robust and Adaptive Optima CoincideResearch Paper
In two-stage optimization under uncertainty, a first-stage decision x is taken before the data are known, and a second-stage decision y is taken after a scenario ω is revealed. The fully adaptive formulation lets y depend on ω and minimizes the worst-case cost. It is the natural model of recourse, but it optimizes over policies, one decision per…
One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties 3: For Maximum Discrepancy, Some Optimum Schedule Is in Standard Form and Has the Release Time PropertyResearch Paper
In just-in-time scheduling each job has a preferred time, and finishing it early is as undesirable as finishing it late. Garey, Tarjan and Wilfong (Math. Oper. Res. 13 (1988), 330–348) study the one-processor version in which task Ti has a length li≥0 and a preferred starting time ai≥0, and the discrepancy of a task started at time si is …
Residual Life Time at Great Age 4: α₁ ≤ tF′(t)/(1 − F(t)) ≤ α₂ for t ≥ t₀ Sandwiches P{(X − t)/t ≤ x | X > t} Between Γ_{α₁}(x) and Γ_{α₂}(x)Research Paper
The residual life time of a lifetime X at age t is the remaining life X−t given survival past t. Its distribution at great age is a basic object in reliability, insurance and the statistics of extremes: excess-of-loss reinsurance prices the part of a claim above a retention level, and peaks-over-threshold methods fit a model to the observations exceeding…
Expected Critical Path Lengths in PERT Networks: With Bundle-Independent Arc Lengths, the Mean-Length Estimate g, Fulkerson's Recursion f and the Expected Critical Path Length e Satisfy g ≤ f ≤ eResearch Paper
PERT (Program Evaluation and Review Technique) and the critical path method model a project as a directed acyclic network whose arcs are jobs and whose nodes are events; the duration of the project is the length of a longest path from the origin to the terminal. When job durations are random, the quantity a planner wants is the expected duration. Computing…
One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties 2: For a Fixed Task Order, the Block-Shifting Algorithm Minimizes the Total DiscrepancyResearch Paper
A task may have a preferred execution time because a material delivery, external event, or downstream operation is timed to it. Starting early can be as costly as starting late. Garey, Tarjan, and Wilfong study this situation on one processor, where tasks cannot overlap but idle time between tasks is permitted. Their total-discrepancy problem is hard when…
Fibonacci Heaps and Their Uses in Improved Network Optimization Algorithms: O(log n) Amortized Time for Delete Min and Delete, O(1) for Every Other F-Heap OperationResearch Paper
Many network optimization algorithms spend most of their time in a heap (priority queue): a set of items with real keys that supports inserting an item, finding and deleting an item of minimum key, melding two heaps, decreasing the key of an item, and deleting an arbitrary item. Dijkstra's shortest-path algorithm performs at most one delete min per vertex…
Matching, Euler Tours and the Chinese Postman II: The Parity Problem Is a Minimum 1-Matching of the Odd Nodes under Shortest-Path LengthsResearch Paper
A postal route that must traverse every street and return to its starting point is a Chinese postman tour. In a street network, crossings are nodes, streets are edges, and the cost of a route is the sum of the lengths of the streets it traverses, counted with repetition. The practical question is which streets must be repeated, and how often. Edmonds and…
Matching, Euler Tours and the Chinese Postman III: Next-Node Lists Describe an Euler Tour iff Their Last-Exit Edges Form an ArborescenceResearch Paper
The Chinese postman problem asks for a shortest closed walk in a graph that traverses every edge at least once. Edmonds and Johnson (Math. Programming 5 (1973) 88–124) reduce it to two subproblems: choosing, by matching, which edges to duplicate so that every node has even degree, and then actually finding an Euler tour of the resulting even graph, a closed…
Minimum Partition of a Matroid Into Independent Subsets: A Matroid Splits Into k Independent Sets Iff Every Subset A Has |A| ≤ k·r(A)Research Paper
A matroid abstracts the dependence structure of the columns of a matrix: which sets of columns are linearly independent, forgetting the numbers themselves. Graphs are the special case of incidence matrices over the integers mod 2, where a set of edges is independent exactly when it contains no cycle. A natural combinatorial question in this setting is the mi…
Truncated-Newton Algorithms for Large-Scale Unconstrained Optimization 2: Exact CG Meets Nonpositive Curvature Unless g Is Orthogonal to the Nonpositive Eigenspaces of HResearch Paper
Truncated-Newton methods minimize a smooth function f:Rn→R by taking, at each iterate xk, a search direction obtained by solving the Newton equation H(xk)p=−g(xk) only approximately, with the linear conjugate gradient (CG) method. Here g is the gradient and H the Hessian of f. The approach was analysed by Dembo and Steihaug (Math.…
The Complexity of Markov Decision Processes V: A Quantified Boolean Formula Is True Iff Its Partially Observed Markov Decision Process Has a Zero-Cost PolicyResearch Paper
A Markov decision process is the standard model of sequential decision making under uncertainty: a controller observes the state of a finite system, chooses a decision, pays a cost, and the system moves to a random next state. In many applications (maintenance, inventory with unreliable records, robotics, medical treatment) the controller does not see the…
The Complexity of Markov Decision Processes II: The Optimal Average Cost of a Deterministic Process Is the Least Mean Cost of a Cycle Reachable from the Initial StateResearch Paper
A Markov decision process describes repeated choices whose costs and subsequent states depend on the current state. Such models are used when a decision affects both today's expense and the options available tomorrow. Papadimitriou and Tsitsiklis studied how the computational difficulty of finding an optimal policy changes between stochastic and…
Approximation Algorithms for Scheduling Unrelated Parallel Machines 3: On the 3-Dimensional Matching Instances, a Schedule within ρ < 3/2 of Optimal Has Makespan ≤ 2 Iff a Matching ExistsResearch Paper
Minimum makespan scheduling on unrelated parallel machines, written R∣∣Cmax, is one of the basic models of scheduling theory: n jobs must each be run on one of m machines, and the time a job takes depends arbitrarily on the machine. Lenstra, Shmoys and Tardos (CWI Report OS-R8714, 1987; journal version Math. Programming 46, 1990) gave a polynomial…
Optimal Estimation of Executive Compensation by Linear Programming I: Least Absolute Deviations under Ranking Constraints Equal a Linear ProgramResearch Paper
A firm may know salary bounds and the ranking of positions without having a reliable sample of individual salaries suitable for least-squares estimation. Charnes, Cooper and Ferguson used that kind of partial information to estimate a salary formula from ratings assigned to job factors. Their 1955 paper gives a model in which weights respect the job…
Approximation Algorithms for Scheduling Unrelated Parallel Machines 4: With Times in {p, q} and gcd(p, q) = 1, a q-Dimensional Matching Exists Iff a Schedule Has Makespan ≤ pqResearch Paper
Minimum makespan scheduling on unrelated parallel machines asks for an assignment of n jobs to m machines, where job j takes pij time units on machine i, so that the largest machine load is as small as possible. In the three-field notation of Graham, Lawler, Lenstra and Rinnooy Kan (1979) it is R∥Cmax. It models load balancing across…
Supply Chain Coordination with Contracts X: Under Forced Compliance, Options Contracts with Shares λ_l and min{λ_h, λ̂_h} Separate the Two Demand Types and Coordinate CapacityTextbook
A manufacturer launching a new product often depends on a single supplier for a critical component, and the supplier must build capacity before demand is known. The manufacturer usually knows more about demand than the supplier does: her sales force, market research and order history give her a forecast the supplier cannot verify, and she has a reason to…
Supply Chain Coordination with Contracts IX: An Internal Market at the Shadow Price w(α, Q) Allocates Output Optimally, and Paying Its Expectation per Unit Induces the Optimal Effort e°Textbook
In most contracts of the supply chain coordination literature the transfer payments are fixed when the contract is signed: a wholesale price w, a buy-back rate b, a revenue share ϕ. Some settings need payments that respond to information arriving after signing, such as realized demand at several retailers and realized production output. Fixing the…
Supply Chain Coordination with Contracts VIII: In the Two-Location Base-Stock Model the Linear Transfers (39)–(41) Make the Optimal Base Stocks the Unique Nash EquilibriumTextbook
In a supply chain with stock at two locations, a supplier holds inventory that replenishes a retailer, and the retailer serves customers. Each firm sets its own inventory level to minimize its own cost. The retailer bears only part of the cost of customer backorders, and the supplier bears none of the retailer's holding cost, so their incentives differ. The…
Integer Programming with a Fixed Number of Variables 2: A Simplex Satisfying (16) Rounds K, B(p,r) ⊂ τK ⊂ B(p,R) with R/r ≤ 2n^(3/2)Research Paper
In 1983 H. W. Lenstra, Jr. proved that integer linear programming with a fixed number of variables is solvable in polynomial time (Lenstra 1983). The algorithm became one of the founding results of algorithmic geometry of numbers: it introduced the strategy of making a convex body "round" by a linear change of coordinates, and then either finding a lattice…