Hardness of Approximating Flow and Job Shop Scheduling Problems 2: Coloring Reduction Gap: Makespan 2L·lb if G Is L-Colorable, Independent Set of Size n/(8L) if Half the Jobs Finish by L·lbResearch Paper
In the job shop problem, jobs are sequences of operations, each to be processed on a given machine for a given time, and the goal is a schedule of minimum makespan (the time at which the last job finishes). Two numbers bound the optimum from below: the longest job and the most loaded machine. Their maximum is written . The best approximation…