Lemma 2.2 — below makespan , at least a fraction of each job's long-operations are good
ProvedFlowJobHardness.FlowShopGap.lemma_2_2Let and be natural numbers and let be a feasible schedule of the flow shop instance (nonnegative start times, the operations of each job in order, no two operations on one machine overlapping). Suppose the makespan of is less than . Then for every job ,
(A job of frequency has long-operations.)
This lemma converts the assumption "the makespan is small" into the statement that most long-operations of every job are followed quickly by the next one; it feeds the averaging argument of Lemma 2.4.
Formalization Note The paper states the lemma for "sufficiently large" without a threshold; the statement as formalized holds for every (for the right-hand side is nonpositive). Fractions are compared as real numbers, after multiplying by the number of long-operations.
import Mathlib import Definitions.Def_JobShopLTAS_Core_Instance import Definitions.Def_FlowJobHardness_FlowShopGap_Construction import Definitions.Def_FlowJobHardness_FlowShopGap_GoodOps open JobShopLTAS.Core
namespace FlowJobHardness.FlowShopGap
/-- Lemma 2.2 (p. 20:10): if a feasible schedule of `F(r, d)` has makespan less than
`r · lb = r · r^{2d}`, then for every job the fraction of its long-operations that are good is
at least `1 - 4/r`. -/
theorem lemma_2_2 (r d : ℕ) (hr : 1 ≤ r) (s : (inst r d).Op → ℝ)
(hs : (inst r d).IsFeasibleSchedule Finset.univ s)
(hmk : (inst r d).makespan Finset.univ s < (r : ℝ) * (r : ℝ) ^ (2 * d))
(q : Fin (size r d)) :
(1 - 4 / (r : ℝ)) * (longCount r d q : ℝ) ≤ (goodCount r d s q : ℝ) := by sorry
end FlowJobHardness.FlowShopGap
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.