Section 1 — under linear deterioration, sequencing by increasing minimizes the expected makespan
ProvedDeterioratingJobs.Makespan.expected_makespan_index_ruleConsider jobs on a single processor, all available at time . Job has a random initial processing requirement on a probability space , assumed integrable, and a growth rate : if it is started at time , its actual processing time is . A schedule is a permutation (: job is processed -th), processed without preemption or idling, with makespan .
If schedules the jobs by increasing values of the index , the ratio of expected initial processing requirement to growth rate, i.e.
then minimizes the expected makespan:
Without deterioration the expected makespan is the same for every non-idling schedule; with job-specific linear deterioration it depends on the order, and this index rule identifies an optimal order.
Formalization Note "Minimized when the jobs are scheduled by increasing values" is read as: every permutation along which the index is non-strictly increasing (any tie-break) achieves the minimum over all permutations. The paper's is implicit (it divides by ) and is a hypothesis here. Integrability of each is assumed so that the expectations are meaningful. The paper's positivity of and the usual independence of the are not assumed; the statement holds without them, which makes it slightly more general than the paper's. Jobs and positions are 0-based.
import Mathlib import Definitions.Def_DeterioratingJobs_Makespan_Model
namespace DeterioratingJobs.Makespan
open MeasureTheory
/-- Browne–Yechiali 1990, p. 496, Section 1, the sentence after Eq. (2): with growth rates
`α_i > 0`, any schedule `π` that processes the jobs by increasing `E(X_i)/α_i` minimizes the
expected makespan `E S_N` over all schedules. -/
theorem expected_makespan_index_rule {Ω : Type*} [MeasurableSpace Ω] (P : Measure Ω)
[IsProbabilityMeasure P] {N : ℕ} (X : Fin N → Ω → ℝ) (hX : ∀ i, Integrable (X i) P)
(α : Fin N → ℝ) (hα : ∀ i, 0 < α i) (π : Equiv.Perm (Fin N))
(hπ : Monotone (fun k : Fin N => (∫ ω, X (π k) ω ∂P) / α (π k))) :
∀ σ : Equiv.Perm (Fin N), expectedMakespan P X α π ≤ expectedMakespan P X α σ := by sorry
end DeterioratingJobs.Makespan
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.