§6.6.1, p. 65 — with p − b = λp, w₂ − b = λc₂: π₂ = λ(Ω₂ − c₂q₁) + w₂q₁, so the contract coordinates period 2
ProvedCachonCoord.DemandUpdate.p65_retailer_period2buy-backcoordinationp2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-bookp2o-v1supply-chain
Take buy back terms with and
Then for all , and the retailer's period-2 profit is
Consequently every supply chain optimal period-2 order (maximizing over ) is optimal for the retailer. When every retailer optimal order is supply chain optimal. The contract coordinates the retailer's period-2 decision.
Formalization Note At the retailer's period-2 profit does not depend on , so every order is optimal for him; the converse direction is therefore stated for only.
Preamble
import Mathlib import Definitions.Def_CachonCoord_DemandUpdate_Model import Definitions.Def_CachonCoord_DemandUpdate_Profits open MeasureTheory ProbabilityTheory
Formal statement
namespace CachonCoord.DemandUpdate
open Model
/-- Cachon (2003), 3rd draft, §6.6.1, p. 65 (the display after "With any of those contracts").
With `λ ∈ [0, 1]`, `p − b = λp` and `w_2 − b = λc_2`, the retailer's period-2 profit is
`π_2(q_2|q_1, ξ) = λ(Ω_2(q_2|q_1, ξ) − c_2 q_1) + w_2 q_1`, so every supply chain optimal period-2
order (over `q_2 ≥ q_1`) is optimal for the retailer, and for `λ > 0` conversely: the contract
coordinates the retailer's period-2 decision. -/
theorem p65_retailer_period2 (M : Model) (lam w2 b : ℝ) (hlam0 : 0 ≤ lam) (hlam1 : lam ≤ 1)
(hb : M.p - b = lam * M.p) (hw2 : w2 - b = lam * M.c2) :
(∀ q1 ξ q2, M.retailerProfit2 w2 b q1 ξ q2 = lam * (M.Omega2 q1 ξ q2 - M.c2 * q1) + w2 * q1) ∧
(∀ q1 ξ q2, IsMaxOn (M.Omega2 q1 ξ) (Set.Ici q1) q2 →
IsMaxOn (M.retailerProfit2 w2 b q1 ξ) (Set.Ici q1) q2) ∧
(0 < lam → ∀ q1 ξ q2, IsMaxOn (M.retailerProfit2 w2 b q1 ξ) (Set.Ici q1) q2 →
IsMaxOn (M.Omega2 q1 ξ) (Set.Ici q1) q2) := by sorry
end CachonCoord.DemandUpdate
Source
Cachon (2003), Supply Chain Coordination with Contracts, 3rd draft (Jan. 2003), §6.6.1, p. 65, the display after "With any of those contracts"
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.