Let be nonnegative integers, , and consider the open shop instance of the proof of Theorem 10.2: A-jobs with processing time on both machines and one B-job with processing time on both machines.
Let be the start times of a feasible open shop schedule in which both operations of end by . Then
The B-job thus occupies one machine during and the other during , which fixes the gaps left for the A-jobs.
Preamble
import Mathlib import Definitions.Def_TwoAgentSched_Shops_Construction
Formal statement
namespace TwoAgentSched.Shops
/-- Proof of Theorem 10.2 (Agnetis et al. 2004, p. 239): in the open shop instance built from the
PARTITION integers `p`, every feasible schedule meeting `C^B_max ≤ Q_B = P` starts the B-job at
time `0` on one machine and at time `P/2` on the other. -/
theorem open_bjob_starts (p : List ℕ)
(s₁ s₂ : Fin ((openInst p).nA + (openInst p).nB) → ℝ)
(hfeas : IsOpenFeasible (openInst p).p1 (openInst p).p2 s₁ s₂)
(hB : (openInst p).MeetsB s₁ s₂ (openQB p)) :
(s₁ (openB p) = 0 ∧ s₂ (openB p) = partSum p / 2) ∨
(s₂ (openB p) = 0 ∧ s₁ (openB p) = partSum p / 2) := by sorry
end TwoAgentSched.Shops
Source
Agnetis, Mirchandani, Pacciarelli & Pacifici, Scheduling Problems with Two Competing Agents, Oper. Res. 52(2) (2004), p. 239, proof of Theorem 10.2 ("The constraint C^B_max ⩽ Q_B = P can be satisfied only if …")
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.