Lemma 1, p. 13 — the §3.4 sequence dominates the path:
ProvedBatchTesting.PTAS.lemma_1approximation-schemedynamic-programmingp2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1sequential-testing
Let be an instance with , , , , let , and let be a path of the dynamic program over . Let be the sequence of §3.4: with , the action copies on the classes ending at , exhausts every class , and leaves the classes above alone; . Then
Together with Lemma 2, this shows that the nice-looking sequence costs at most times the original path (Theorem 2).
Formalization Note. The sequence may repeat a state (a zero action), as on the page.
Preamble
import Mathlib import Definitions.Def_BatchTesting_PTAS_Model
Formal statement
namespace BatchTesting.PTAS
theorem lemma_1 {n : ℕ} (I : Instance n) (hI : I.Standing) (eps : ℝ) (h0 : 0 < eps) (h1 : eps ≤ 1)
(πs : List (State I eps)) (hπs : IsPath I eps (F I eps) πs) :
List.Forall₂ (fun Nstar N => Nstar ≤ N) πs (niceSeq I eps πs) := by sorry
end BatchTesting.PTAS
Source
Segev & Shaposhnik, A Polynomial-Time Approximation Scheme for Sequential Batch Testing of Series Systems, SSRN preprint 3277805 (Nov. 2018), p. 13, §3.4, Lemma 1
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.