Chapter IX, § 12, Eq. (12.13) — for step controls
ProvedBellmanDP.Variational.payoff_discretization_errorcalculus-of-variationsnumerical-analysisoptimal-controlp2o-batch-b23bp2o-gran-per-chapterp2o-plan-bookp2o-v1
Let and satisfy the assumptions (11) of Chapter IX, Theorem 2, and write , . Let and . Then there is a constant , depending only on , , and , such that for every and every discrete control , , with associated step function on ,
Here along any solution of , , on , and with , .
The estimate compares a discrete control with the continuous control it induces; both halves of the convergence proof of Theorem 2 rest on it.
Formalization Note The print names the constant and then writes in the display; they are the same constant. The step count is the corrected .
Preamble
import Mathlib import Definitions.Def_BellmanDP_Variational_Approximation
Formal statement
namespace BellmanDP.Variational
open Set
/-- Bellman, *Dynamic Programming*, Ch. IX, § 12, proof of Theorem 2, Eq. (12.13), p. 262: under the
assumptions (11) on `F (x, y)`, `G (x, y)`, for `c > 0` and `T > 0` there is a constant `B′`
(depending only on `c, T, F, G`) such that for every `n ≥ 1` and every step control
`φ (t) = φ_k` on `k/n ≤ t < (k+1)/n` with `0 ≤ φ_k ≤ 1`,
`|J (φ) − J_N ({φ_k}, n)| ≤ B′ / n`, where `J (φ) = ∫_0^T F (x, φ x) dt` along the solution of
`dx/dt = G (x, φ x)`, `x (0) = c`, and `N = ⌊T n⌋`. -/
theorem payoff_discretization_error (F G : ℝ → ℝ → ℝ) (hFG : Assumptions11 F G)
(c T : ℝ) (hc : 0 < c) (hT : 0 < T) :
∃ B : ℝ, ∀ n : ℕ, 0 < n → ∀ (φs : ℕ → ℝ) (x : ℝ → ℝ),
(∀ k ≤ horizonSteps T n, φs k ∈ Icc (0 : ℝ) 1) →
IsTrajectory (phiForm G) c (stepControl n φs) T x →
|(∫ t in (0 : ℝ)..T, phiForm F (x t) (stepControl n φs t)) -
discretePayoff (phiForm F) (phiForm G) c n φs (horizonSteps T n)| ≤ B / n := by sorry
end BellmanDP.Variational
Source
Bellman, Dynamic Programming, Princeton University Press (1957; Princeton Landmarks ed. 2010), DOI 10.2307/j.ctv1nxcw0f, Chapter IX, § 12, proof of Theorem 2, Eq. (12.13), p. 262
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.