Lemma 11, p. 22 — the oracle's expected regret is , independent of , and the periods
ProvedPeriodicMAB.Upper.lemma_11Fix the noise parameter . There is a constant , depending only on , such that the following holds for every number of arms , horizon , periods , means and noise satisfying: each has minimum period , Assumption 1, Assumption 2 with parameter , and Assumption 3 with the parameters (7). Run the weak oracle with and . Then its pseudo-regret satisfies
This is the regret of the oracle that knows the periods; the proof of Theorem 1 transfers it to the two-stage policy on the event .
Formalization Note The expectation is an outer expectation: there is an integrable with pointwise and below the bound, so no measurability of the regret is presupposed. The constant is chosen after and before , , the periods, the means and the noise, matching "the Constant is not related to , or any ". The page states the lemma "under Assumption 1 and 2"; its proof also uses (p. 45), (p. 46) and Assumption 3 (through Lemma 16), which are standing assumptions of §4 and are stated as hypotheses. Without Assumption 3, is possible and the right-hand side can vanish.
import Mathlib import Definitions.Def_PeriodicMAB_Upper_Model import Definitions.Def_PeriodicMAB_Upper_Spectral import Definitions.Def_PeriodicMAB_Upper_Policy open MeasureTheory ProbabilityTheory Finset open scoped NNReal
namespace PeriodicMAB.Upper
/-- Lemma 11 (p. 22): under Assumptions 1–3, with the parameters (7) and `δ = 8/T`, the oracle's
expected pseudo-regret is at most `C √(T d log²(T) log(T/d))` with a constant `C` depending on
`σ` only (not on `T`, `K` or the periods). The expectation is an outer expectation. -/
theorem lemma_11 (σ : ℝ≥0) (hσ : 0 < σ) :
∃ C : ℝ, 0 < C ∧
∀ (K : ℕ) [NeZero K] (T : ℕ) (Tper : Fin K → ℕ) (μ : Fin K → ℕ → ℝ)
{Ω : Type} [MeasurableSpace Ω] (P : Measure Ω) [IsProbabilityMeasure P]
(ε : ℕ → Ω → ℝ),
(∀ k, IsMinPeriod (μ k) (Tper k)) → Assumption1 μ T → IsSubGaussianNoise P ε σ →
Assumption3 T (nPar T K) (gPar (nPar T K)) Tper →
∃ Z : Ω → ℝ, Integrable Z P ∧
(∀ ω, pseudoRegret μ T (oracle μ ε σ (8 / T) T (nPar T K) Tper ω) ≤ Z ω) ∧
∫ ω, Z ω ∂P ≤ C * Real.sqrt (T * effArms Tper * Real.log T ^ 2 *
Real.log (T / effArms Tper)) := by sorry
end PeriodicMAB.Upper
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.