Proof of Lemma 9 —
ProvedFlowJobShop.SPT.mft_lower_boundjob-shoplower-boundmean-flow-timep2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Let a job shop with processors and jobs be given, the total task time of job , an SPT order (), and any feasible non-preemptive schedule. Then
This is the lower bound of the proof of Lemma 9, multiplied by , for every feasible schedule and hence for an OMFT schedule . Together with the upper bound on the SPT schedule it gives Lemma 9.
Formalization Note Positions are 0-based; for both sides are (Lean's ). The bound is multiplied by instead of divided by it. The paper assumes .
Preamble
import Mathlib import Definitions.Def_JobShopLTAS_Core_Instance import Definitions.Def_FlowJobShop_SPT_MeanFlowTime import Definitions.Def_FlowJobShop_SPT_ListSchedule open JobShopLTAS.Core
Formal statement
namespace FlowJobShop.SPT
/-- For every feasible non-preemptive schedule `τ` of an `m`-processor, `n`-job job shop and every
SPT order `σ`, `m · MFT(τ) ≥ (1/n) ∑_{k} ∑_{j ≤ k} L_{σ j}` (Gonzalez–Sahni 1978, proof of
Lemma 9, p. 47: `MFT(S*) ≥ (1/n) ∑_{k=1}^n ∑_{j=1}^k L_j/m`, multiplied by `m`). -/
theorem mft_lower_bound {m n : ℕ} (inst : Instance m n) (hm : 0 < m) (σ : Fin n ≃ Fin n)
(hσ : IsSPTOrder inst σ) (τ : inst.Op → ℝ) (hτ : IsPaperFeasibleSchedule inst τ) :
(∑ k : Fin n, ∑ j ∈ Finset.Iic k, inst.jobLength (σ j)) / n ≤
(m : ℝ) * meanFlowTime inst τ := by sorry
end FlowJobShop.SPT
Source
Gonzalez, Sahni, Flowshop and Jobshop Schedules: Complexity and Approximation, Operations Research 26(1) (1978), p. 47, §2, proof of Lemma 9 ('and so MFT(S*) ≥ (1/n) Σ_{k=1}^n Σ_{j=1}^k L_j/m')
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.