Lemma 2 — is an optimal schedule for the extended problem (E)
ProvedDelayedSWPT.Extended.piE_optimalonline-algorithmsp2o-batch-pfp1ap2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Let be the Delayed SWPT schedule of an instance (P), let (E) be the extended problem obtained by replacing the release dates by and adding a unit gap job (release date , weight , where is the job Delayed SWPT selected but did not start at ) for every idle slot in which a job was available, and let be the schedule of (E) that runs the jobs of as in and each gap job in . Then is optimal for (E):
for every feasible nonpreemptive schedule of (E).
This lemma says that Delayed SWPT is optimal once its idle time is charged to the gap jobs; it is the lower-bound side of the reduction in Lemma 3.
Preamble
import Mathlib import Definitions.Def_DelayedSWPT_Extended_Problem
Formal statement
namespace DelayedSWPT.Extended
open DelayedSWPT.Model
/-- Lemma 2 of Anderson and Potts (2004), p. 690: `π_E` is an optimal schedule for the
extended problem (E), among all feasible nonpreemptive schedules of (E). -/
theorem piE_optimal {n : ℕ} (I : Instance n) :
IsOptimal (rE I) (pE I) (wE I) (piE I) := by sorry
end DelayedSWPT.Extended
Source
Anderson and Potts, Online Scheduling of a Single Machine to Minimize Total Weighted Completion Time, Math. Oper. Res. 29(3) (2004), p. 690, Lemma 2
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.