Lemma 8.1 (ii) — when
ProvedNumStochOpt.ListScheduling.lemma_8_1_ii_expected_max_over_sqrtextreme-valuesp2o-batch-b23ap2o-gran-per-chapterp2o-plan-bookp2o-v1probability
Let be independent, identically distributed, nonnegative random variables with , and let . Then
This is the expectation counterpart of Lemma 8.1 (i); it controls the error term of (8.10) after taking expectations. The book states it without proof and refers to Feller.
Formalization Note is the Bochner integral ∫ ω, maxProcTime n (fun j => p j ω) ∂P; the maximum is integrable since it is measurable and bounded by . The other conventions are those of Lemma 8.1 (i).
Preamble
import Mathlib import Definitions.Def_NumStochOpt_ListScheduling_Makespan open MeasureTheory ProbabilityTheory Filter Topology
Formal statement
namespace NumStochOpt.ListScheduling
/-- Lemma 8.1 (ii), p. 206: if the processing times `p 0, p 1, …` are i.i.d., nonnegative, with
`E p₁² < ∞`, then `E p_max / √n → 0`, `p_max = max_{j<n} p j`. -/
theorem lemma_8_1_ii_expected_max_over_sqrt {Ω : Type*} [MeasurableSpace Ω] {P : Measure Ω}
[IsProbabilityMeasure P] (p : ℕ → Ω → ℝ) (hmeas : ∀ j, Measurable (p j))
(hindep : iIndepFun p P) (hident : ∀ j, IdentDistrib (p j) (p 0) P P)
(hnonneg : ∀ j ω, 0 ≤ p j ω) (hsq : Integrable (fun ω => p 0 ω ^ 2) P) :
Tendsto (fun n : ℕ => (∫ ω, maxProcTime n (fun j => p j ω) ∂P) / Real.sqrt n)
atTop (𝓝 0) := by sorry
end NumStochOpt.ListScheduling
Source
A. H. G. Rinnooy Kan, L. Stougie, "Stochastic Integer Programming", in Ermoliev & Wets (eds.), Numerical Techniques for Stochastic Optimization, Springer 1988, Ch. 8, p. 206, Lemma 8.1 (ii) (model: p. 205)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.