Section 1, after Eq. (2) — is the sum (1) with ,
ProvedDeterioratingJobs.Makespan.expected_makespan_eq_lemma1Sumdeteriorating-jobsp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1schedulingstochastic-scheduling
In the linear deterioration model on a probability space , suppose every initial processing requirement is integrable. Then for every schedule the expected makespan is
that is, the sum (1) of Lemma 1 with and .
This is the "identification of the proper terms in Lemma 1" that the paper makes after (2): it reduces the expected makespan to a deterministic objective to which Lemma 1 applies.
Formalization Note Expectations are Bochner integrals; integrability of each is assumed (without it the integral is by convention). No independence and no sign condition on or is needed. Positions are 0-based.
Preamble
import Mathlib import Definitions.Def_DeterioratingJobs_Makespan_InterchangeSum import Definitions.Def_DeterioratingJobs_Makespan_Model
Formal statement
namespace DeterioratingJobs.Makespan
open MeasureTheory
/-- Section 1, after Eq. (2) (Browne–Yechiali 1990, p. 496): the expected makespan has the form (1)
of Lemma 1 with `μ_i = E(X_i)` and `γ_i = 1 + α_i`:
`E S_N(π) = ∑_i E(X_{π(i)}) ∏_{r>i} (1 + α_{π(r)})`. -/
theorem expected_makespan_eq_lemma1Sum {Ω : Type*} [MeasurableSpace Ω] (P : Measure Ω)
[IsProbabilityMeasure P] {N : ℕ} (X : Fin N → Ω → ℝ) (hX : ∀ i, Integrable (X i) P)
(α : Fin N → ℝ) (π : Equiv.Perm (Fin N)) :
expectedMakespan P X α π =
lemma1Sum (fun i => ∫ ω, X i ω ∂P) (fun i => 1 + α i) π := by sorry
end DeterioratingJobs.Makespan
Source
Browne, Yechiali, Scheduling Deteriorating Jobs on a Single Processor, Oper. Res. 38 (1990), p. 496, Section 1, the sentence after Eq. (2) (identification of the proper terms in Lemma 1)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.