THEOREM 1(c)(iii): if g(r) = ∞ then (S∖{i_r}) ⊇ Ω(j)
ProvedFedergruenTzur.MinPred.theorem1c_iiidynamic-programminglot-sizinglower-envelopep2o-batch-pfp1ap2o-gran-per-chapterp2o-plan-paperp2o-v1
In the dynamic lot size model with costs given by the recursion (2), fix and let with be ranked in nonascending order of -values, ties in ascending order of period index, with critical values and . If , then
A last element that never overtakes its predecessor may be deleted from the list.
Formalization Note. 0-based in Lean: is gval j L (r-1) and is L.getD (r-1) 0. For the hypothesis cannot hold, since is finite. is taken in the open-interval reading.
Preamble
import Mathlib import Definitions.Def_FedergruenTzur_MinPred_Omega import Definitions.Def_FedergruenTzur_MinPred_RankedList
Formal statement
namespace FedergruenTzur.MinPred
open LotSizing
/-- THEOREM 1(c)(iii), p. 915: if `g(r) = ∞` then `S ∖ {i_r} ⊇ Ω(j)`.
(0-based: `g(r) = gval j L (r - 1)`, `i_r = L[r - 1]`.) -/
theorem theorem1c_iii (P : LotSizing) (j : ℕ) (hj : 1 ≤ j) (L : List ℕ)
(hL : P.IsRanked j L) (hΩ : P.Omega j ⊆ L.toFinset) (hlen : 0 < L.length)
(hg : P.gval j L (L.length - 1) = ⊤) :
P.Omega j ⊆ L.toFinset.erase (L.getD (L.length - 1) 0) := by sorry
end FedergruenTzur.MinPred
Source
Federgruen and Tzur, A Simple Forward Algorithm to Solve General Dynamic Lot Sizing Models with n Periods in O(n log n) or O(n) Time, Management Science 37(8), 1991, p. 915, THEOREM 1(c)(iii)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.