Theorem 4(a), claim (B): for some , hence
ProvedSchedComplexity.TotalCompletion.claim_Bnp-completenessp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1schedulingtotal-completion-time
Let be positive integers with , and consider the instance and threshold of the construction of Theorem 4(a). In every feasible schedule with :
- some job of starts no later than : for some ;
- the jobs outside satisfy
Part 1 is claim (B); part 2 is the consequence the paper draws from (A) and (B) and uses in the proofs of (C) and (D).
Formalization Note Starting times are natural numbers (Section 3); the paper's proof passes from to .
Preamble
import Mathlib import Definitions.Def_SchedComplexity_TotalCompletion_SingleMachine import Definitions.Def_SchedComplexity_TotalCompletion_Construction
Formal statement
namespace SchedComplexity.TotalCompletion
/-- Proof of Theorem 4(a), claim (B) and its consequence (pp. 22–23): in every feasible schedule
of the constructed instance with `Σ_j C_j ≤ y`, some job of `U` starts at a time `B_j ≤ σ`, and
`Σ_{j∉U} C_j ≤ u`. -/
theorem claim_B {t : ℕ} (a : Fin t → ℕ) (b : ℕ)
(ha : ∀ i, 0 < a i) (hb : 0 < b) (hbA : b < sumA a)
(B : Fin (numJobs a b) → ℕ)
(hB : IsFeasible (procTime a b) (release a b) B)
(hy : ∑ j, completion (procTime a b) B j ≤ yThreshold a b) :
(∃ j ∈ groupU a b, B j ≤ sigma a b) ∧
∑ j ∈ (groupU a b)ᶜ, completion (procTime a b) B j ≤ uCount a b := by sorry
end SchedComplexity.TotalCompletion
Source
Brucker, Lenstra & Rinnooy Kan, Complexity of Machine Scheduling Problems, Mathematisch Centrum Report BW 43/75 (1975), p. 22 (statement) and p. 23 (proof and consequence), proof of Theorem 4(a), claim (B)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.