§2, algorithm H — every flow shop on a group of at most two processors has an OFT schedule
ProvedFlowJobShop.PairGroups.optimal_group_schedules_existflow-shopp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Let be a flow shop with processors and jobs, and let . Then the flow shop on the processor group (just for the last group when is odd) has an optimal finish time schedule: there is a feasible non-preemptive schedule of with
The paper obtains such a schedule with Johnson's algorithm. This statement guarantees that the optimal group schedules assumed in Lemma 11 exist, so that heuristic H is well defined on every instance.
Formalization Note Johnson's algorithm and its running time are not formalized; only the existence of an optimal schedule, which is what heuristic H uses, is stated.
Preamble
import Mathlib import Definitions.Def_FlowJobShop_PairGroups_FlowShop import Definitions.Def_FlowJobShop_PairGroups_AlgorithmH
Formal statement
namespace FlowJobShop.PairGroups
open FlowShop
/-- §2, description of algorithm H (p. 48): for every group `g` of at most two processors, the
flow shop on that group has an optimal finish time schedule (the paper obtains it with
Johnson's algorithm). -/
theorem optimal_group_schedules_exist {m n : ℕ} (F : FlowShop m n) (g : Fin ((m + 1) / 2)) :
∃ ρ : Fin (groupSize m g) → Fin n → ℝ, (F.group g).IsOptimal ρ := by sorry
end FlowJobShop.PairGroups
Source
Gonzalez, Sahni, Flowshop and Jobshop Schedules: Complexity and Approximation, Operations Research 26(1) (1978), p. 48, §2, description of algorithm H (Johnson's algorithm)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.