Theorem 4(a), claim (D):
ProvedSchedComplexity.TotalCompletion.claim_Dnp-completenessp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1schedulingtotal-completion-time
Let be positive integers with , and consider the instance and threshold of the construction of Theorem 4(a). In every feasible schedule with , the last job starts exactly at its release date:
This is claim (D) of the converse direction. Together with (C) it shows that exactly jobs of fill the period .
Formalization Note The claim is about schedules with integral starting times, as in Section 3 of the paper; the printed proof passes from to . With real starting times the claim would fail: when KNAPSACK has a solution, can be delayed by a small amount without exceeding .
Preamble
import Mathlib import Definitions.Def_SchedComplexity_TotalCompletion_SingleMachine import Definitions.Def_SchedComplexity_TotalCompletion_Construction
Formal statement
namespace SchedComplexity.TotalCompletion
/-- Proof of Theorem 4(a), claim (D) (pp. 22–23): in every feasible schedule (integral starting
times) of the constructed instance with `Σ_j C_j ≤ y`, the last job starts exactly at its
release date: `B_n = tτ + b`. -/
theorem claim_D {t : ℕ} (a : Fin t → ℕ) (b : ℕ)
(ha : ∀ i, 0 < a i) (hb : 0 < b) (hbA : b < sumA a)
(B : Fin (numJobs a b) → ℕ)
(hB : IsFeasible (procTime a b) (release a b) B)
(hy : ∑ j, completion (procTime a b) B j ≤ yThreshold a b) :
B (lastJob a b) = t * tau a b + b := by sorry
end SchedComplexity.TotalCompletion
Source
Brucker, Lenstra & Rinnooy Kan, Complexity of Machine Scheduling Problems, Mathematisch Centrum Report BW 43/75 (1975), p. 22 (statement) and p. 23 (proof), proof of Theorem 4(a), claim (D)