Lemma 1, p. 6 — every minimum a-b-cut of D has an n-cut of the same capacity
ProvedProjSchedMinCut.Transform.lemma_1Let be the minimum cut digraph of an instance of the project scheduling problem with start-time dependent costs , and assume a feasible schedule exists. If is a minimum --cut of , then there exists an -cut of with
Recall that an -cut is an --cut in which, for every job, exactly one assignment arc is in the cut. The lemma shows that restricting attention to -cuts loses nothing when computing a minimum cut, which is what makes the minimum cut value equal to the optimal scheduling cost.
Formalization Note Only the first sentence of Lemma 1 is formalized; its second sentence, that can be computed from in time , is a running-time claim and is omitted. As in the paper, no finiteness of is assumed. Capacities are in .
import Mathlib import Definitions.Def_ProjSchedMinCut_Transform_Setting
namespace ProjSchedMinCut.Transform
open Instance
/-- Lemma 1, p. 6: for every minimum `a`-`b`-cut `(X, X̄)` of `D` there is an `n`-cut
`(X*, X̄*)` of `D` with the same capacity. -/
theorem lemma_1 {n : ℕ} (I : Instance n) (hw : ∀ j t, 0 ≤ I.w j t)
(hfeas : ∃ S, I.Feasible S) :
∀ X, I.IsMinCut X → ∃ Xs, I.IsNCut Xs ∧ I.cutCap Xs = I.cutCap X := by sorry
end ProjSchedMinCut.Transform
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.