Equation (14), p. 8 — maximal time distortion occurs at a knot
ProvedInhomMJPStrong.J1.eq_14p2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1skorokhod-j1time-change
Let , with the inspection-grid times strictly increasing, and fix . Let be the interpolation between up to , with slope one afterwards. Then the largest absolute time displacement is attained and equals the largest displacement at a knot:
This deterministic identity converts the grid discrepancy of Lemma 1 into the time-distortion term of the metric.
Formalization Note Lean states that the right side is the greatest member of the set of all time-displacement values, which includes both the supremum equality and attainment.
Preamble
import Mathlib import Definitions.Def_InhomMJPStrong_J1_Model
Formal statement
namespace InhomMJPStrong.J1
/-- Equation (14), p. 8: the largest time distortion occurs at a grid knot. -/
theorem eq_14 (χ θ : ℕ → ℝ) (m : ℕ)
(hχ0 : χ 0 = 0) (hθ0 : θ 0 = 0)
(hχ : StrictMono χ) (hm : 1 ≤ m) :
IsGreatest
((fun t : ℝ => |timeChange χ θ m t - t|) '' Set.Ici (0 : ℝ))
(maxGap θ χ m) := by sorry
end InhomMJPStrong.J1
Source
Bladt & Peralta, Strongly convergent homogeneous approximations to inhomogeneous Markov jump processes and applications, arXiv:2204.02954v3, p. 8, equation (14)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.