p. 403, An Example — the bound of a node with jobs is the makespan of its completion (general form)
ProvedIgnallSchrage.Makespan.lowerBound_eq_makespan_of_terminalbranch-and-boundflow-shoplower-boundp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Let be a node with of the jobs and let be the full sequence that begins with , i.e. followed by its one unscheduled job. Then
The paper observes this for its example ("node 231's lower bound, which is the makespan for sequence 2314"); this is the general form. It is what turns the bound of a terminal node into the value of an actual sequence, and so lets the stopping rule certify optimality.
Formalization Note The paper states the identity for one node of its example only; the statement here is its general form for any and any real processing times.
Preamble
import Mathlib import Definitions.Def_IgnallSchrage_Makespan_LowerBound
Formal statement
namespace IgnallSchrage.Makespan
/-- General form of p. 403 ("node 231's lower bound, which is the makespan for sequence 2314"):
for a node `J = J_{n-1}` with `n - 1` jobs, `LB(J_{n-1})` equals the makespan of the full
sequence `σ` that begins with `J_{n-1}` (i.e. `J_{n-1}` followed by its one unscheduled job). -/
theorem lowerBound_eq_makespan_of_terminal {n : ℕ} (a b c : Fin n → ℝ) (J : List (Fin n))
(hJ : J.length + 1 = n) (σ : Equiv.Perm (Fin n)) (hσ : BeginsWith σ J) :
lowerBound a b c J = makespan a b c σ := by sorry
end IgnallSchrage.Makespan
Source
Ignall and Schrage, Application of the branch and bound technique to some flow-shop scheduling problems, Oper. Res. 13 (1965), p. 403, An Example, "node 231's lower bound, which is the makespan for sequence 2314" (general form)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.