Lemma 7 — preemptive finish time 2tB iff 3-PARTITION is solvable
ProvedFlowJobShop.ThreePartJob.lemma_7_preemptivejob-shopp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1reductionschedulingthree-partition
For every valid 3-PARTITION instance with groups of target sum , construct the two-machine job shop of Lemma 7. Then
This is the decision equivalence established inside the proof of Lemma 7. It is the mathematical reduction on which the paper's preemptive complexity claim rests.
Formalization Note The paper states this as “3-Partition preemptive JOFT with .” The formal theorem is the explicit equivalence for the constructed instance. It does not encode polynomial-time reduction or NP membership.
Preamble
import Mathlib import Definitions.Def_ResourceScheduling_Chain_ThreePartition import Definitions.Def_JobShopLTAS_Core_Instance import Definitions.Def_FlowJobShop_ThreePartJob_Instance import Definitions.Def_FlowJobShop_ThreePartJob_Schedules
Formal statement
namespace FlowJobShop.ThreePartJob
open ResourceScheduling.Chain
/-- Lemma 7, p. 44: the constructed two-machine job shop admits a
preemptive schedule of finish time at most `2tB` exactly when the input
has a 3-partition. -/
theorem lemma_7_preemptive (C : ThreePartition) (hvalid : C.Valid) :
(∃ S : PreemptiveSchedule (reductionInstance C),
S.FinishesBy (threshold C)) ↔ C.HasSolution := by sorry
end FlowJobShop.ThreePartJob
Source
Gonzalez, Sahni, Flowshop and Jobshop Schedules: Complexity and Approximation, Operations Research 26(1) (1978), p. 44, Lemma 7 and its proof, https://doi.org/10.1287/opre.26.1.36
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.