(8), p. 95 — the IR constraints (6) imply the cumulative bounds (1 − Ω_j^out) f_j(t) ≤ f_0(t + j) ≤ (1 + A_j^out) f_j(t)
ProvedQFlexSC.ZeroInv.eq_8inventoryp2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1rolling-horizonsupply-chainsupply-contracts
Let be the release schedules a flex node receives in periods , and let the output QF parameters satisfy and for . If every revision obeys the output Incremental Revision constraints (6),
then for all and
where and .
These are the Cumulative Flexibility (CF) constraints: the current estimate bounds the actual purchase in period . They convert the period-to-period revision rules into the bounds the MC policy plans against.
Formalization Note. The paper states (8) for ; the case is the trivial identity and is included. No sign condition on is needed.
Preamble
import Mathlib import Definitions.Def_QFlexSC_ZeroInv_Model
Formal statement
namespace QFlexSC.ZeroInv
theorem eq_8 (P : QFParams) (f : ℕ → ℕ → ℝ)
(hstd : ∀ q, 1 ≤ q → 0 ≤ P.αout q ∧ 0 ≤ P.ωout q ∧ P.ωout q ≤ 1)
(hIR : IROut P f) :
∀ t j : ℕ, (1 - Ωcum P.ωout j) * f t j ≤ f (t + j) 0 ∧
f (t + j) 0 ≤ (1 + Acum P.αout j) * f t j := by sorry
end QFlexSC.ZeroInv
Source
Tsay & Lovejoy, Quantity flexibility contracts and supply chain performance, MSOM 1(2) (1999), p. 95, (8)–(9)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.