Eq. (10.9): the expected cost of the order-up-to- rule is
ProvedInventoryControl.cs_total_cost_eqclark-scarfinventory-controlmulti-echelonoperations-researchprobability
When installation 2 holds the echelon position and installation 1 realizes , the expected total reallocated cost equals
for every , every level and , with and .
The last term is the book's "shortage cost at installation 2 induced by its inability to deliver on time to installation 1": on the event installation 1 receives only instead of . The identity holds for any ; it is the evaluation of a piecewise expectation, and it is what makes computable from the tabulated loss function.
Preamble
import Definitions.Def_InventoryControl_clarkScarf
Formal statement
namespace InventoryControl
theorem cs_total_cost_eq (e1 e2 b1 mu sigma : ℝ) (hs : 0 < sigma) (L1 L2 : ℕ) (S1 y2 : ℝ) :
∫ u, (csStage2Cost e2 mu L2 y2 + csStage1Cost e1 e2 b1 mu sigma L1 (min S1 (y2 - u)))
∂(csDemand mu sigma L2)
= csTotalCost e1 e2 b1 mu sigma L1 L2 S1 y2 := by sorry
end InventoryControl
Source
Sven Axsäter, Inventory Control, 3rd ed., Springer 2015, DOI 10.1007/978-3-319-15729-0, p. 196, Sect. 10.1.1, Eq. (10.9)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.