Proposition 4.6, p. 19 — (f_k^primal) and (f_k^dual) are non-increasing upper bounds on f⋆
ProvedRobustPMI.Hierarchy.proposition_4_6p2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1polynomial-optimizationrobust-optimizationsemidefinite-programmingsum-of-squares
Let (RPMIO) have an optimal solution and let Assumptions 1 and 3 hold. For the moment-SOS hierarchy (4.4)–(4.5), the sequences
are monotonically non-increasing in the relaxation order , and every term is an upper bound on the robust optimum:
Unlike the usual Lasserre hierarchy, which approximates the optimum from below, this hierarchy restricts the robust constraint and approaches from above. Assumption 2 is not needed here.
Formalization Note Both values are extended reals ( when (4.5) is infeasible), and is coerced to the extended reals. The standing assumption of p. 2 (an optimizer exists) and the symmetry of and are hypotheses.
Preamble
import Mathlib import Definitions.Def_RobustPMI_Hierarchy_Model
Formal statement
namespace RobustPMI.Hierarchy
/-- Proposition 4.6 (p. 19): under Assumptions 1 and 3 (and the standing assumption that (RPMIO) has
an optimizer), `(f_k^primal)_{k ≥ ⌈k_x/2⌉}` and `(f_k^dual)_{k ≥ ⌈k_x/2⌉}` are non-increasing and
bounded below by `f⋆`. -/
theorem proposition_4_6 {ℓ n m q s : ℕ} (f : MvPolynomial (Fin ℓ) ℝ)
(θ : Fin s → MvPolynomial (Fin ℓ) ℝ)
(P : Matrix (Fin m) (Fin m) (MvPolynomial (Fin ℓ ⊕ Fin n) ℝ))
(G : Matrix (Fin q) (Fin q) (MvPolynomial (Fin n) ℝ))
(hP : P.IsSymm) (hG : G.IsSymm)
(h1 : Assumption1 f θ P G) (h3 : Assumption3 θ P G)
(hmin : ∃ y, IsGlobalMin f θ P G y) :
AntitoneOn (fprimal f θ P G) (Set.Ici ((kx P G + 1) / 2)) ∧
AntitoneOn (fdual f θ P G) (Set.Ici ((kx P G + 1) / 2)) ∧
∀ k : ℕ, (kx P G + 1) / 2 ≤ k →
(fstar f θ P G : EReal) ≤ fprimal f θ P G k ∧ (fstar f θ P G : EReal) ≤ fdual f θ P G k := by sorry
end RobustPMI.Hierarchy
Source
Guo, Wang, A moment-SOS hierarchy for robust polynomial matrix inequality optimization with SOS-convexity, arXiv:2304.12628v5, p. 19, Proposition 4.6
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.