Proof of Theorem 5(a) — c_jk = μ + 2λ if (j,k) ∈ A, μ + 2λ + 2 if (j,k) ∉ A
ProvedSchedComplexity.NoWait.delay_constructionno-waitnp-completenessp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Under the hypotheses of the positivity statement (admissible , , ), the delays (9) of the instance constructed in Theorem 5 are, for distinct jobs ,
The paper: "Through the choice of , it is immediate that is maximal for ." Arcs of thus become cheap transitions between consecutive jobs, non-arcs expensive ones.
Formalization Note The delay is computed for the instance's processing times (the natural-number conversion of the integer processing times).
Preamble
import Mathlib import Definitions.Def_SchedComplexity_NoWait_Construction
Formal statement
namespace SchedComplexity.NoWait
/-- p. 25: in the construction of Theorem 5, for an admissible `ι`, `λ ≥ 1`, `μ ≥ 2λ + 3` and
distinct jobs `j ≠ k`, the delay (9) is `c_{jk} = μ + 2λ` if `(j,k) ∈ A` and `μ + 2λ + 2` if
`(j,k) ∉ A`. -/
theorem delay_construction {n : ℕ} (adj : Fin n → Fin n → Bool) (ι : Fin n → Fin n → ℕ)
(hι : Admissible n ι) (lam mu : ℕ) (hlam : 1 ≤ lam) (hmu : 2 * lam + 3 ≤ mu)
(j k : Fin n) (hjk : j ≠ k) :
delay (procTimes adj ι lam mu) (numMachines_pos n) j k =
if adj j k = true then (mu : ℤ) + 2 * lam else (mu : ℤ) + 2 * lam + 2 := by sorry
end SchedComplexity.NoWait
Source
Brucker, Lenstra & Rinnooy Kan, Complexity of Machine Scheduling Problems, Mathematisch Centrum Report BW 43/75 (1975), p. 25, proof of Theorem 5(a)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.