Theorem 4.13 — Delay List on a -approximate one-machine schedule is a -approximation on machines
ProvedAvgCompletionSched.DelayList.delay_list_approximationLet be an instance of scheduling with release dates , processing times , weights and precedence constraints, to minimize the sum of weighted completion times. Let be a feasible one-machine schedule of that is within a factor of an optimal one-machine schedule: for every feasible one-machine schedule of . Let and . Then every schedule produced by the continuous-time algorithm Delay List with parameter on machines using as the list satisfies, for every feasible -machine schedule of ,
This is the paper's general conversion theorem: any one-machine approximation algorithm for a scheduling problem with release dates and precedence constraints yields an -machine approximation algorithm, losing at most the factor on and the additive ; for and it gives the factor .
Formalization Note The optimum is not formed as an infimum: both the -hypothesis and the conclusion are quantified over every feasible schedule of the same instance (with release dates and precedence). The bound is claimed for every run of the algorithm, whatever its tie-breaking.
Retired 2026-10-27: a Lean-vs-paper fidelity audit found this statement weaker than, or narrower than, the cited result. A corrected statement will be resubmitted.
import Mathlib import Definitions.Def_AvgCompletionSched_DelayList_Model import Definitions.Def_AvgCompletionSched_DelayList_Algorithm
namespace AvgCompletionSched.DelayList
/-- Theorem 4.13 (p. 161): given an instance `I` of scheduling with release dates and precedence
constraints to minimize the sum of weighted completion times, and a feasible one-machine schedule
`S^1` of `I` within a factor `ρ` of every feasible one-machine schedule of `I`, every run of the
continuous-time algorithm Delay List (`β > 0`, `m ≥ 2` machines) using `S^1` as the list gives an
`m`-machine schedule whose sum of weighted completion times is within a factor
`(1 + β) ρ + (1 + 1/β)` of that of every feasible `m`-machine schedule of `I`. -/
theorem delay_list_approximation {n m : ℕ} (I : Instance n) (hm : 2 ≤ m) (β ρ : ℝ)
(hβ : 0 < β) (S1 : Schedule I 1) (hρ : ∀ S1' : Schedule I 1, S1.wct ≤ ρ * S1'.wct)
(π : Fin n ≃ Fin n) (hπ : IsCompletionOrder S1 π) (D : DelayListRun I m)
(hD : IsDelayListSchedule I m π β D) (N : Schedule I m) :
D.wct ≤ ((1 + β) * ρ + (1 + 1 / β)) * N.wct := by sorry
end AvgCompletionSched.DelayList
Read-back
What the Lean code literally says, in plain math · claude-opus-5-5
Throughout, and are natural numbers. is an object of type Instance n from the imported definitions file Def_AvgCompletionSched_DelayList_Model. Its fields and meaning are not shown in the code I was given; its name suggests a scheduling instance with jobs indexed by . Several other names used below also come from the two imported definition files, whose contents I was not given: Schedule, wct, IsCompletionOrder, DelayListRun and IsDelayListSchedule. So this read-back can report only how the statement uses them, not what they unfold to. The doc-comment's description of these objects is the author's gloss. It is not part of what the statement asserts.
Hypotheses. The statement takes the following data and assumptions.
- Machines. .
- Parameters. Two real numbers and , with . Nothing is assumed about : it need not be positive or at least .
- The one-machine schedule. is an element of
Schedule I 1, the type of "schedules of on machine". Its quantitywctis written below; the name suggests a sum of weighted completion times. - The factor . For every element of
Schedule I 1,
- The list. is a bijection from to itself, i.e. a permutation of the job indices. The predicate
IsCompletionOrderholds of and ; its definition is not shown. - The Delay List run. is an element of
DelayListRun I m, a type separate fromSchedule I m. The predicateIsDelayListScheduleholds of , , , and ; its definition is not shown. The statement does not assume that is unique for these data: the conclusion is claimed for every satisfying the predicate. - The comparison schedule. is an arbitrary element of
Schedule I m. It is not assumed optimal or special in any way.
Conclusion. The quantity wct of the run is at most a fixed multiple of the quantity wct of :
Because ranges over every element of Schedule I m, this bound holds against all -machine schedules of simultaneously. The two wct quantities belong to different types (DelayListRun I m versus Schedule I m). Whether they are computed the same way depends on the unshown definitions.
Degenerate cases.
- Division. Since , the term is a genuine reciprocal, not the default value that Lean gives to division by zero.
- The factor . The hypothesis on may be applied with itself, which gives . If , this forces . If , it places no restriction on from that instance, so may be zero or negative whenever the hypothesis holds for all . In that case the factor could be small or even negative, and the conclusion is claimed all the same.
- Zero jobs (). Then is the empty permutation. The values of on schedules of an empty instance are fixed by the unshown definitions, as is whether such schedules exist.
- Vacuous cases. If
Schedule I mhas no elements, or if no satisfiesIsDelayListSchedule, or if no permutation satisfiesIsCompletionOrderwith , then the statement is vacuously true. Whether any of these can happen is determined by the unshown definitions. The typeSchedule I 1is non-empty, since is supplied. - Few machines. The cases and are excluded by .
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.