Proof of Theorem 5(a) — an admissible ordering ι of the job pairs exists (n ≠ 2)
ProvedSchedComplexity.NoWait.iota_existscombinatoricsno-waitp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Let and . There is a bijection from the ordered pairs of distinct jobs onto the machine indices such that
i.e. "for no some directly follows an ". The paper says that "such an ordering of the pairs can easily be constructed".
This property makes the partial sums of the construction unambiguous and is used in computing the delays .
Formalization Note The paper does not exclude , but there no such ordering exists: the two pairs and violate the condition in either order. The statement therefore assumes (for there are no pairs and the empty assignment works). The reduction of Theorem 5 must treat separately.
Preamble
import Mathlib import Definitions.Def_SchedComplexity_NoWait_Construction
Formal statement
namespace SchedComplexity.NoWait /-- The ordering `ι` of p. 24 exists for every number of jobs `n ≠ 2`: a bijection from ordered pairs of distinct jobs onto the machines `2, …, n(n−1)+1` such that no `ι(j,ℓ)` equals `ι(ℓ,k) + 1`. (For `n = 2` no such ordering exists; the paper says it "can easily be constructed" without excluding this case.) -/ theorem iota_exists (n : ℕ) (hn : n ≠ 2) : ∃ ι : Fin n → Fin n → ℕ, Admissible n ι := by sorry end SchedComplexity.NoWait
Source
Brucker, Lenstra & Rinnooy Kan, Complexity of Machine Scheduling Problems, Mathematisch Centrum Report BW 43/75 (1975), p. 24, proof of Theorem 5(a)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.