Proof of Theorem 10.2 — PARTITION yes iff the open shop instance meets and
ProvedTwoAgentSched.Shops.theorem_10_2_equivalenceopen-shopp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1partitionschedulingtwo-agent
Let be nonnegative integers and . Consider the open shop instance of the proof of Theorem 10.2 (A-jobs with time on both machines, one B-job with time on both machines) with thresholds and . Then
This equivalence is the correctness of the reduction of PARTITION to ; it holds for every , odd included.
Formalization Note The printed proof says ; what the argument uses is that each machine carries total work . The statement is unaffected.
Preamble
import Mathlib import Definitions.Def_TwoAgentSched_Shops_Construction
Formal statement
namespace TwoAgentSched.Shops
open ProjSchedTW.Complexity
/-- Proof of Theorem 10.2 (Agnetis et al. 2004, p. 239), the equivalence: the PARTITION instance
`p` is a yes-instance iff the constructed open shop instance has a feasible schedule with
`C^A_max ≤ 3P/2` and `C^B_max ≤ P`. -/
theorem theorem_10_2_equivalence (p : List ℕ) :
PartitionYes p ↔ (openInst p).OpenYes (openQA p) (openQB p) := by sorry
end TwoAgentSched.Shops
Source
Agnetis, Mirchandani, Pacciarelli & Pacifici, Scheduling Problems with Two Competing Agents, Oper. Res. 52(2) (2004), p. 239, proof of Theorem 10.2 (the equivalence, with Figure 3)
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.