Corollary 4.12 —
ProvedAvgCompletionSched.DelayList.completion_bound_one_machineLet be a feasible one-machine schedule of an instance with release dates and precedence constraints, and let be a schedule produced by the continuous-time algorithm Delay List with parameter on machines using as the list (its jobs in order of completion in ). Then for each job ,
Summing this bound with the weights gives Theorem 4.13.
Formalization Note The completion order of a feasible one-machine schedule obeys the precedence constraints automatically, because processing times are positive; no separate hypothesis is needed.
import Mathlib import Definitions.Def_AvgCompletionSched_DelayList_Model import Definitions.Def_AvgCompletionSched_DelayList_Algorithm
namespace AvgCompletionSched.DelayList
/-- Corollary 4.12 (pp. 160–161): let `S^m` be a schedule produced by the continuous-time
algorithm Delay List using a feasible one-machine schedule `S^1` as the list (its jobs in order of
completion). Then for each job `J_i`, `C^m_i ≤ (1 + β) C^1_i / m + (1 + 1/β) κ_i`. -/
theorem completion_bound_one_machine {n m : ℕ} (I : Instance n) (hm : 2 ≤ m) (β : ℝ)
(hβ : 0 < β) (S1 : Schedule I 1) (π : Fin n ≃ Fin n) (hπ : IsCompletionOrder S1 π)
(D : DelayListRun I m) (hD : IsDelayListSchedule I m π β D) (i : Fin n) :
D.C i ≤ (1 + β) * S1.C i / m + (1 + 1 / β) * kappa I i := by sorry
end AvgCompletionSched.DelayList
Read-back
What the Lean code literally says, in plain math · claude-opus-5-5
Hypotheses.
- ;
- ;
- a feasible one-machine schedule with completion times ;
- a list that is a completion order of ();
- a run on machines satisfying the Delay List property for ;
- any job .
The statement does not separately assume that obeys precedence.
Conclusion.
where:
- is the run's completion time;
- is the recursive quantity , or if has no predecessors.
Degenerate cases.
- Division by and by is genuine.
- : vacuous.
- and are excluded by hypothesis.
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.