Proof of Lemma 11 —
ProvedFlowJobShop.PairGroups.group_optimum_le_finishTimeapproximation-algorithmsflow-shopp2o-batch-pfp2bp2o-gran-per-chapterp2o-plan-paperp2o-v1scheduling
Let be a flow shop with processors and jobs, and for every group let be an optimal finish time schedule of the flow shop on the processor pair , with finish time . Then for every feasible non-preemptive schedule of (in particular for an OFT schedule ),
This is the lower bound on the optimum used in the proof of Lemma 11.
Formalization Note The maximum is a fold of max with baseline over the groups, so it is when ; all finish times are nonnegative, so the baseline changes nothing otherwise.
Preamble
import Mathlib import Definitions.Def_FlowJobShop_PairGroups_FlowShop import Definitions.Def_FlowJobShop_PairGroups_AlgorithmH
Formal statement
namespace FlowJobShop.PairGroups
open FlowShop
/-- Proof of Lemma 11 (p. 49): the finish time of an optimal schedule of the flow shop on any
processor group is at most the finish time of any feasible schedule of the whole flow shop;
hence `FT(S*) ≥ max_g f(R(g))`. -/
theorem group_optimum_le_finishTime {m n : ℕ} (F : FlowShop m n)
(R : (g : Fin ((m + 1) / 2)) → Fin (groupSize m g) → Fin n → ℝ)
(hR : ∀ g, (F.group g).IsOptimal (R g))
(τ : Fin m → Fin n → ℝ) (hτ : F.IsFeasible τ) :
(Finset.univ : Finset (Fin ((m + 1) / 2))).fold max 0
(fun g => (F.group g).finishTime (R g)) ≤ F.finishTime τ := by sorry
end FlowJobShop.PairGroups
Source
Gonzalez, Sahni, Flowshop and Jobshop Schedules: Complexity and Approximation, Operations Research 26(1) (1978), p. 49, §2, proof of Lemma 11
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.