Lemma 2, p. 8 — every feasible solution of (1)–(5) is the image under (7) of an n-cut with c(X, X̄) = w(x)
ProvedProjSchedMinCut.Transform.lemma_2minimum-cutn-cutp2o-batch-pfp2ap2o-gran-per-chapterp2o-plan-paperp2o-v1project-schedulingtime-indexed-formulation
Let be the minimum cut digraph of an instance of the project scheduling problem with start-time dependent costs , and assume a feasible schedule exists. For each feasible solution of the integer program (1)–(5) there exists an -cut of of finite capacity such that is the image of under the mapping (7), and
This is the surjectivity half of Theorem 1.
Formalization Note Finiteness of is stated explicitly; it also follows from , since is a real number. The capacity is compared with through the embedding of into .
Preamble
import Mathlib import Definitions.Def_ProjSchedMinCut_Transform_Setting
Formal statement
namespace ProjSchedMinCut.Transform
open Instance
/-- Lemma 2, p. 8: every feasible solution `x` of (1)–(5) is the image under (7) of an `n`-cut
`(X, X̄)` of `D` (necessarily of finite capacity), and `w(x) = c(X, X̄)`. -/
theorem lemma_2 {n : ℕ} (I : Instance n) (hw : ∀ j t, 0 ≤ I.w j t)
(hfeas : ∃ S, I.Feasible S) :
∀ x, I.IPFeasible x →
∃ X, I.IsNCut X ∧ I.cutCap X < ⊤ ∧ I.xOfCut X = x ∧
I.cutCap X = ENNReal.ofReal (I.cost x) := by sorry
end ProjSchedMinCut.Transform
Source
Möhring, Schulz, Stork & Uetz, Solving project scheduling problems by minimum cut computations, manuscript (July 2000, revised April 2002 and November 2002), p. 8, Lemma 2
Human review
Confirmed by the mission captain (proposal self-audit).
Confirmed by the moderator at approval.